Customer Stories

Measured across our costomer base

AVG. OEE GAIN

+27.4%

vs. pre-GlobalReader baseline

AVG. CAPACITY RECOVERED

€39,200

per machine, per year

MANUFACTURERS SERVED

200+

across Europe

WOOD / VENEER

OEE

30 to 35% β†’ 20%

unplanned interruptions

Veneer manufacturer Balti Spoon knew their machines were running. What they didn't know was how much output they were losing to hidden stoppages. A two-sensor setup separately measured working time and pieces produced, exposing the gap between "machine running" and "machine actually producing." They unlocked capacity they didn't know they had.

METAL

21 CNC MACHINES

3-YEAR DEPLOYMENT

From 4 CNC machines to 21: a metal manufacturer's 3-year OEE improvement story

A 4,300 mΒ² metal components manufacturer running 2,300 machine hours/month started with 4 CNC machines in November 2019. Within four months they added 10 more, and today 21 turning, milling, grinding and broaching machines are connected. They now answer the questions production managers couldn't before: "The machine is running, so why are we behind target?" OEE and availability rose noticeably and stayed up through 2020, 2021 and 2022.

WOOD / VENEER

OEE

30 to 35% β†’ 20%

unplanned interruptions

Veneer manufacturer Balti Spoon knew their machines were running. What they didn't know was how much output they were losing to hidden stoppages. A two-sensor setup separately measured working time and pieces produced, exposing the gap between "machine running" and "machine actually producing." They unlocked capacity they didn't know they had.

WOOD / VENEER

OEE

30 to 35% β†’ 20%

unplanned interruptions

Veneer manufacturer Balti Spoon knew their machines were running. What they didn't know was how much output they were losing to hidden stoppages. A two-sensor setup separately measured working time and pieces produced, exposing the gap between "machine running" and "machine actually producing." They unlocked capacity they didn't know they had.

WOOD / VENEER

OEE

30 to 35% β†’ 20%

unplanned interruptions

Veneer manufacturer Balti Spoon knew their machines were running. What they didn't know was how much output they were losing to hidden stoppages. A two-sensor setup separately measured working time and pieces produced, exposing the gap between "machine running" and "machine actually producing." They unlocked capacity they didn't know they had.

WOOD / VENEER

OEE

30 to 35% β†’ 20%

unplanned interruptions

Veneer manufacturer Balti Spoon knew their machines were running. What they didn't know was how much output they were losing to hidden stoppages. A two-sensor setup separately measured working time and pieces produced, exposing the gap between "machine running" and "machine actually producing." They unlocked capacity they didn't know they had.

Quickly scaled

from 4 to 21 machines in 3 yrs